Metal Roofing Permit in Surfside, Florida: A Step-by-Step Guide

July 18, 2025

How to Get a Metal Roofing Permit in Surfside, Florida

Installing a metal roof in Surfside, Florida, a picturesque coastal town, is an excellent choice for durability and resilience against hurricanes. A building permit is required to ensure compliance with the Florida Building Code and Miami-Dade County’s High-Velocity Hurricane Zone (HVHZ) standards. This guide outlines the process for obtaining a metal roofing permit from the Town of Surfside’s Building Department, with practical tips to streamline your project.

Why You Need a Metal Roofing Permit in Surfside

The Town of Surfside mandates permits for all roofing projects to ensure safety, structural integrity, and adherence to HVHZ standards, critical for Miami-Dade County’s hurricane-prone environment. Permits also maintain the town’s aesthetic standards and prevent fines, delays, or complications during property transactions. Follow these steps to secure your permit efficiently.

Step-by-Step Guide to Obtaining a Metal Roofing Permit

1. Complete the Permit Application

Download the Building Permit Application from the Town of Surfside’s Building Department page or access it through the online permitting portal. Include the following details:

  • Property Information: Address and folio number (available via the Miami-Dade County Property Appraiser).
  • Project Description: Specify “metal roofing installation.”
  • Estimated Job Value: Total cost of materials and labor.
  • Signatures: Signed by the property owner and a licensed contractor, or owner-builder if applicable.

2. Gather Required Documents

Prepare the following documents to support your application:

  • Proof of Ownership: A warranty deed or recent tax receipt.
  • Contractor’s License: Details of a Florida Certified Roofing Contractor (required unless you’re an owner-builder).
  • Owner/Builder Affidavit: Required if performing the work yourself, available via the Permits & Applications page.
  • Construction Documents: Include a site plan, roof framing plan, material specifications, fastener details, and a roofing permit checklist, as outlined in the Miami-Dade County Roofing Inspection Report.
  • Miami-Dade Notice of Acceptance (NOA): Verify your metal roofing product is approved for HVHZ use in Miami-Dade County.
  • Hurricane Mitigation Documentation: Details on secondary waterproofing, roof sheathing, and roof-to-wall connections, as required by Miami-Dade County’s Hurricane Mitigation Guidelines.

Check the Permits & Applications page for any additional project-specific requirements.

3. Submit Your Application

Submit your application and documents electronically via the Town of Surfside’s online permitting portal or in person at the Building Department, located at 9293 Harding Avenue, Surfside, FL 33154. You’ll receive a process number for tracking, and your plans will be routed to the Building Department and other relevant departments (e.g., Fire or Environmental Resources) for review.

4. Plan Review and Fees

The Building Department reviews your application for compliance with the Florida Building Code, HVHZ standards, and local regulations. Additional reviews by Miami-Dade County departments (e.g., Fire or Environmental Resources) may be required. An upfront fee is typically charged at submission, with final fees calculated upon approval. The review process typically takes 7–14 business days, depending on project complexity and submission accuracy. Check the Building Department page for the current fee schedule.

5. Permit Approval and Issuance

Upon approval, you’ll be notified to pay the final permit fee through the online portal or at the Building Department. After payment, a digital permit card will be issued, which must be displayed at the job site during construction.

6. Schedule Inspections

Inspections are required at various stages of the installation, including a final inspection to close the permit. Schedule inspections through the online permitting portal or by contacting the Building Department at (305) 865-4865. Ensure compliance with HVHZ standards, such as proper fastening and secondary water barriers, to pass inspections.

Key Tips for a Smooth Permitting Process

  • Hire a Licensed Contractor: A Florida Certified Roofing Contractor can manage permitting and ensure HVHZ compliance, reducing errors and delays.
  • Owner-Builder Option: If acting as your own contractor, submit an Owner/Builder Affidavit and proof of ownership, but expect thorough HVHZ compliance checks.
  • Verify HVHZ Compliance: Use metal roofing panels with a valid Miami-Dade NOA to meet High-Velocity Hurricane Zone requirements.
  • Accurate Documentation: Double-check roof dimensions, slope, and product details to avoid delays or inspection failures.
  • Use Online Tools: Leverage the Town’s online permitting portal for faster submission and real-time tracking of your application status.

Summary of Permit Requirements

Requirement Details/Notes
Permit Application Submitted via online portal or in person, signed by owner and contractor
Proof of Ownership Warranty deed or tax receipt
Contractor License Florida Certified Roofing Contractor (unless owner-builder)
Construction Documents Site plan, roof framing plan, material specs, NOA, and hurricane mitigation details
Submission Method Electronic via online portal or in person at 9293 Harding Avenue, Surfside, FL 33154
Review Time 7–14 business days (varies by complexity)
Inspections Required at multiple stages, including final inspection

Contact the Surfside Building Department

For assistance, contact the Town of Surfside Building Department:

Conclusion

Obtaining a metal roofing permit in Surfside, Florida, is straightforward when you follow these steps and utilize the Town’s online permitting tools. Whether you hire a licensed contractor or pursue the owner-builder route, ensuring compliance with HVHZ standards and local codes is critical for a successful project. Start your metal roofing installation by contacting a trusted contractor or the Surfside Building Department today!

Need help with your roofing project? Reach out to the Building Department or a qualified roofing professional for guidance!

Call Now Button