Metal Roofing Permit in Biscayne Park, Florida: A Step-by-Step Guide

July 18, 2025

How to Get a Metal Roofing Permit in Biscayne Park, Florida: A Step-by-Step Guide

Installing a metal roof in Biscayne Park, Florida, a charming village in Miami-Dade County, is an excellent choice for durability and resilience against hurricanes. A building permit is required to ensure compliance with the Florida Building Code and Miami-Dade County’s High-Velocity Hurricane Zone (HVHZ) standards. This guide outlines the process for obtaining a metal roofing permit from the Village of Biscayne Park’s Building Department, with tips to streamline your project.

[](https://en.m.wikipedia.org/wiki/Biscayne_Park%2C_Florida)

Why You Need a Metal Roofing Permit in Biscayne Park

The Village of Biscayne Park mandates permits for all roofing projects to ensure safety, structural integrity, and adherence to HVHZ standards, critical for Miami-Dade County’s hurricane-prone environment. Permits also protect property value and prevent fines, delays, or complications during property transactions. Follow these steps to secure your permit efficiently.

Step-by-Step Guide to Obtaining a Metal Roofing Permit

1. Complete the Permit Application

Obtain the Building Permit Application from the Village of Biscayne Park’s Building Department page or in person at Village Hall. Include the following details:

  • Property Information: Address and folio number (available via the Miami-Dade County Property Appraiser).
  • Project Description: Specify “metal roofing installation.”
  • Estimated Job Value: Total cost of materials and labor.
  • Signatures: Signed by the property owner and a licensed contractor, or owner-builder if applicable.

2. Gather Required Documents

Prepare the following documents to support your application:

  • Proof of Ownership: A warranty deed or recent tax receipt.
  • Contractor’s License: Details of a Florida Certified Roofing Contractor (required unless you’re an owner-builder).
  • Owner/Builder Affidavit: Required if performing the work yourself, available via the Building Department page.
  • Construction Documents: Include a site plan, roof framing plan, material specifications, fastener details, and a roofing permit checklist, as outlined in the Miami-Dade County Roofing Inspection Report.
  • Miami-Dade Notice of Acceptance (NOA): Verify your metal roofing product is approved for HVHZ use in Miami-Dade County.
  • Hurricane Mitigation Documentation: Details on secondary waterproofing, roof sheathing, and roof-to-wall connections, as required by Miami-Dade County’s Hurricane Mitigation Guidelines.

Check the Building Department page for any additional project-specific requirements.

3. Submit Your Application

Submit your application and documents in person at the Building Department, located at 600 NE 114th Street, Biscayne Park, FL 33161, or check if electronic submission is available via the Building Department page. You’ll receive a process number for tracking, and your plans will be routed to the Building Department and other relevant departments (e.g., Fire or Environmental Resources) for review.

[](https://biscayneparkfl.gov/contact)

4. Plan Review and Fees

The Building Department reviews your application for compliance with the Florida Building Code, HVHZ standards, and local regulations. Additional reviews by Miami-Dade County departments (e.g., Fire or Environmental Resources) may be required. An upfront fee is typically charged at submission, with final fees calculated upon approval. The review process typically takes 10–15 business days, depending on project complexity and submission accuracy. Contact the Building Department for the current fee schedule.

5. Permit Approval and Issuance

Upon approval, you’ll be notified to pay the final permit fee at Village Hall or through any available online portal. After payment, a permit card will be issued, which must be displayed at the job site during construction.

6. Schedule Inspections

Inspections are required at various stages of the installation, including a final inspection to close the permit. Schedule inspections by contacting the Building Department at (305) 899-8000. Ensure compliance with HVHZ standards, such as proper fastening and secondary water barriers, to pass inspections.

[](https://biscayneparkfl.gov/contact)

Key Tips for a Smooth Permitting Process

  • Hire a Licensed Contractor: A Florida Certified Roofing Contractor can manage permitting and ensure HVHZ compliance, reducing errors and delays.
  • Owner-Builder Option: If acting as your own contractor, submit an Owner/Builder Affidavit and proof of ownership, but expect thorough HVHZ compliance checks.
  • Verify HVHZ Compliance: Use metal roofing panels with a valid Miami-Dade NOA to meet High-Velocity Hurricane Zone requirements.
  • Accurate Documentation: Double-check roof dimensions, slope, and product details to avoid delays or inspection failures.
  • Check Submission Options: Confirm with the Building Department if online submission is available to expedite the process.

Summary of Permit Requirements

Requirement Details/Notes
Permit Application Submitted in person or online (if available), signed by owner and contractor
Proof of Ownership Warranty deed or tax receipt
Contractor License Florida Certified Roofing Contractor (unless owner-builder)
Construction Documents Site plan, roof framing plan, material specs, NOA, and hurricane mitigation details
Submission Method In person at 600 NE 114th Street, Biscayne Park, FL 33161, or online (if available)
Review Time 10–15 business days (varies by complexity)
Inspections Required at multiple stages, including final inspection

Contact the Biscayne Park Building Department

For assistance, contact the Village of Biscayne Park Building Department:

Conclusion

Obtaining a metal roofing permit in Biscayne Park, Florida, is straightforward when you follow these steps and ensure compliance with HVHZ standards and local codes. Whether you hire a licensed contractor or pursue the owner-builder route, thorough preparation is key to a successful project. Start your metal roofing installation by contacting a trusted contractor or the Biscayne Park Building Department today!